Hangar Under Construction
Hangar Under Construction
More Details
Description:
Hangar under construction – still time to choose interior color and bathroom finishes
Land is owned, no ground lease
60 x 60 Hangar
22’6” on sides, 25’ center
Full bath including shower
Kitchen and laundry rough-in
400 amp with room to expand
Bricked side
Rollup 12’x12’ door with remote
Powerlift door – 54’ x 18’ with remote 4 large windows
Private gated community with HOA community pool and outdoor kitchen
City water, gas, sewer, and hi-speed internet
Construction completion – May 2026
T31 Aerocountry East, privately owned, public use airport in McKinney TX
3000’ x 60’ paved and lighted runway, an additional 1,350’ turf runway
Airplane weight Max: 6500 lbs.
On-field AVGAS
Location
Hangar Under Construction
Description
Hangar under construction – still time to choose interior color and bathroom finishes
Land is owned, no ground lease
60 x 60 Hangar
22’6” on sides, 25’ center
Full bath including shower
Kitchen and laundry rough-in
400 amp with room to expand
Bricked side
Rollup 12’x12’ door with remote
Powerlift door – 54’ x 18’ with remote 4 large windows
Private gated community with HOA community pool and outdoor kitchen
City water, gas, sewer, and hi-speed internet
Construction completion – May 2026
T31 Aerocountry East, privately owned, public use airport in McKinney TX
3000’ x 60’ paved and lighted runway, an additional 1,350’ turf runway
Airplane weight Max: 6500 lbs.
On-field AVGAS
Contact Information
Name: Cynthia Newman
Phone: 972-626-7851
Email: contact-bba1d9af@hangartrader.com
Company: JADE 1 LLC