We are building two identical 60' X 60' box hangers. Each will have their own private, climate controlled office and bathroom w/ hot water. Additional build out features available upon request. The hangars will be on the east side of the airport away from all the T hangar and FBO traffic. Fuel truck will come directly to your hangar. Private 90 foot taxiway that will access hangars from air ops area. Will include gated access and exterior security cameras. The anticipated build completion date is January 2026.
NOTE: The pictures are from the construction of our existing hangar. The two new hangars will be built in the empty lot opposite the east ramp of the airport.
Name | Description |
---|---|
Advertiser's Name | Craig |
Company | JD Russell Co. |
Hangar Width | 60 Feet |
Hangar Depth | 60 Feet |
Hangar Height | 18 Feet |
Land Lease Cost | N/A |
Price Basis | Per Month |
Advertiser Type | Developer |